The construction of Marina Vela is about to start

  • 13 enero, 2017

FLOVAC will begin this month the construction of its vacuum sewer system in the new marina in Barcelona: Marina Vela.

Proyection of Marina Vela

The vacuum system implemented in Marina Vela will have two vacuum networks: one for wastewater generated in the marina (urban wastewater) and a parallel network where bilge water, which require treatment prior to discharge into the sewage collected of the port.

The marina will have 136 berths to take in boats up to 50 meters in length, which can be served without displacement. In addition, the marina is located next to the beach and close to the city center, which will make it an exceptional commercial hub with high standing services around.

The system designed and installed by FLOVAC will collect both the wastewater from boats docked at the marina as discharges of the own marina buildings such as the restaurant, offices, locker rooms, gym, etc.

Dejar comentario

Recibe nuestras noticias