Vacuum Sewer System Design

Flovac is an expert engineering company that provides solutions for wastewater engineering problems in unique geographic areas or environmentally sensitive areas, using vacuum technology. We are aware of the importance of local knowledge of the clients and the specific projects we have to work in. For this reason, Flovac’s engineers work closely with customers with training on how to design the system, checking all calculations and assisting with the full process of the project. Click here for more information about the Flovac group and our services.

Because our main goal is to find the best solution for each project, at Flovac we offer a free service for making concept plans as well as budgets for your project. Contact us to compare how a vacuum system could work in your area.

Flovac Vacuum Station

Design Process

The planning of any vacuum sewerage project usually follows the following structure:

  • Design Flows.
  • Project Service Area.
  • Catchment Area Determination by Vacuum Station.
  • Vacuum Station Location.
  • Locate Collection Pits.
  • Locate the Vacuum Mains.
  • Size the Vacuum Mains.
  • Locate the Division Valves.
  • Design Long Sections.
  • Vacuum Station.

Customization of Each Project

At Flovac we know that each project is different based on its condition and characteristics. There is no “one design fits all” approach that can be taken. This is why we offer a personalized and adapted design for each project in order to guarantee an effective and successful installation.

Over the years, design rules have changed and new technologies have emerged. Our long career has allowed us to incorporate all these improvements over the years and offer now the most innovative vacuum technology.

Master Planning

Ensuring proper planning is vital when designing a vacuum sewerage system. Any mistake could lead do:

  • Excess flows.
  • Undersized mains.
  • Undersized vacuum stations and treatment plants.
  • High power use.
  • Flooding and overflows.
  • System collapses.

A well-understood system from a planning perspective is key to preventing future complications. For this reason, at Flovac we guarantee an excellent study prior to any installation.

Master Plan Information

When managing a new project or an extension request, we always make sure to previously check the following aspects:

  • Are the master plans properly updated with as-constructed data?
  • What flow rates were originally designed for in the system and what are the current flow rates?
  • Have densities changed?
  • What are the calculated head losses on the vacuum lines?
  • Is the right emergency storage being allowed for?
  • Did the original design call for a pump station upgrade at some future population density or flow rate?
  • Are there other areas that could now be accommodated?

Operational Knowledge is Key

Operational knowledge is key to ensure a proper functioning of the system. If we have a good master plan in place, a request for an extension or sub division can happen fairly quickly. The one area that many designers forget is in knowing how well the system is currently operating. At Flovac, our engineers always require approval from our operational groups prior to any modification to ensure an up-to-date knowledge of the status of our installations at any time.

Project Development Process

It is important to know how vacuum systems work in order to understand the planning of the project. The first step is to see if a vacuum system would be best suited for your project, or a combination of technologies. The second step is to send us a layout of your project, whether it is a septic tank replacement scheme, a new land development, a marina or something else where you may need a vacuum solution. Lastly, tell us the flow rates you would like us to use and where the sewage should be sent to.

At Flovac we will work with you on the costings and whole of life costs, including operational costs. And then, we will work with you on the full design and installation of the system. Please contact us if you need any further information.

Vacuum Sewer system design
Vacuum Sewer System Design